The purpose of this course is to ensure that you have maintained the knowledge & understanding to carry out Track Handback duties on Network Rail Infrastructure.
Employers shall have systems in place to assure the continued Competence of persons undertaking track engineering work. These systems shall consist as a minimum of:
- The use of a log book to record work experience.
- The implementation of a review or re-assessment regime as defined in NR/L3/TRK 1020 Track Hand Back for Projects: Confirming track is safe for opening at the selected line speed after projects engineering work.
Employers shall have systems in place to assure the continued Competence of persons undertaking track engineering work. These
systems shall consist as a minimum of:
- The use of a log book to record work experience which shall be reviewed by a responsible manager to confirm the person has practised the competence at least four times a year.
- The implementation of a re-assessment regime that confirms, at least every 3 years, that:
- The work completed by the person meets the requirements of the performance statements in the relevant competence standard.
- The person has the knowledge defined in the relevant competence standard.
- There have been no incidents accidents or near misses as a result of the person completing the work.
This assessment provides you with the knowledge assessment required to confirm with the standard.
You can download course materials by clicking on the course materials tab.
These course materials can be downloaded to be used when completing the course questions.
- NRL2TRK2102 Issue 12 Design & Constructionof Track
- NRL2TRK001 Mod 02 Issue 07 Track Inspection
- NRL2TRK001 Mod 03 Issue 8 Plain Line Track
- NRL2TRK001 Mod 04 ISSUE 8 Rail Joints
- NRL2TRK001 Mod 05 Issue 09 Switches & Crossings
- NRL2TRK001 Mod 06 Issue 10 Visual inspection, ultrasonic and eddy current testing of rails
- NRL2TRK001 Mod 07 Issue 9 Management of Rail Defects
- NRL2TRK001 Mod 08 Issue 6 Broken or Damaged Rails
- NRL2TRK001 Mod 09 Issue 6 Loss of Rail Section
- NRL2TRK001 Mod 10 Issue 6 Rail profile management
- NRL2TRK001 Mod 11 Issue 11 Track geometry - inspections and minimum actions
- NRL2TRK001 Mod 12 Issue 8 Track geometry - maintenance design requirements
- NRL2TRK001 Mod 13 Issue 8 Confirming track is safe for selected linespeed after work
- NRL2TRK001 Mod 14 Issue 08 Managing Track in Hot Weather
- NRL2TRK001 Mod 15 Issue 6 Managing track in cold weather
- NRL2TRK001 Mod 16 Issue 7 Adjustment switches
- NRL2TRK001 Mod 17 Issue 6 Sidings
- NRL2TRK001 Mod 18 Issue 7 Buffer stops
- NRL2TRK001 Mod 19 Issue 6 Track Inspection Handbook
- NRL2TRK001 Mod 20 Issue 02 Plain Line pattern Recognition
- TEF3306 Issue 01 Track Handback Certificate of Competence
- TEF3203 Infrastructure Conformance Certificate